5,118
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0552 #02 Y:2009 | 02 | 2009 | Size electric motors for peak operating efficiency | $6,900 | $20,000 | |
| OR0552 #01 Y:2009 | 01 | 2009 | Use steam pressure reduction to generate power | $517,700 | $1,250,000 | |
| OR0551 #05 Y:2009 | 05 | 2009 | Repair faulty insulation in furnaces, boilers, etc | $83,890 | $100,800 | |
| OR0551 #04 Y:2009 | 04 | 2009 | Install occupancy sensors | $28,320 | $48,980 | |
| OR0551 #03 Y:2009 | 03 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $29,500 | - | |
| OR0551 #02 Y:2009 | 02 | 2009 | Eliminate or reduce compressed air usage | $28,529 | $42,146 | |
| OR0551 #01 Y:2009 | 01 | 2009 | Upgrade controls on compressors | $77,191 | $50,820 | |
| OR0550 #09 Y:2009 | 09 | 2009 | Use optimum size and capacity equipment | $9,660 | $1,330 | |
| OR0550 #08 Y:2009 | 08 | 2009 | Upgrade controls on compressors | $24,600 | $7,540 | |
| OR0550 #07 Y:2009 | 07 | 2009 | Install adequate dryers on air lines to eliminate blowdown | $1,600 | - | |
| OR0550 #06 Y:2009 | 06 | 2009 | Use / purchase optimum sized compressor | $22,900 | $12,750 | |
| OR0550 #05 Y:2009 | 05 | 2009 | Use most efficient type of electric motors | $16,286 | $42,778 | |
| OR0550 #04 Y:2009 | 04 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $5,335 | $11,100 | |
| OR0550 #03 Y:2009 | 03 | 2009 | Use heat in flue gases to preheat products or materials | $60,786 | $20,000 | |
| OR0550 #02 Y:2009 | 02 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $3,835 | - | |
| OR0550 #01 Y:2009 | 01 | 2009 | Repair and eliminate steam leaks | $435,946 | $2,900 | |
| OR0549 #05 Y:2009 | 05 | 2009 | Install / repair insulation on steam lines | $8,800 | $3,500 | |
| OR0549 #04 Y:2009 | 04 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $7,682 | - | |
| OR0549 #03 Y:2009 | 03 | 2009 | Reduce combustion air flow to optimum | $28,000 | $700 | |
| OR0549 #02 Y:2009 | 02 | 2009 | Preheat combustion air with waste heat | $46,600 | $27,000 |