Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Plywood and Veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 3,600,000
ft2
Annual Production 45,000,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,235,494 20,352,900
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $247,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $217,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $77,191 $50,820 $77,191
1,482,736
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $28,529 $42,146 $28,529
505,090
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,500 - $29,500
546,000
kWh
-
04 2.7135: Install occupancy sensors $28,320 $48,980 $28,320
456,776
kWh
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $83,890 $100,800 - $83,890
-
MMBtu
TOTAL RECOMMENDED $247,430 $242,746 $163,540
2,990,602
kWh
$83,890
-
MMBtu
TOTAL IMPLEMENTED $217,930 $242,746 $134,040
2,444,602
kWh
$83,890
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs