ITAC Assessment: UW2312
ITAC logo
ITAC Assessment: UW2312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Kitchen and Bath cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $50
M
to 100
M
# of Employees 242
Plant Area 276,000
ft2
Annual Production 85,600
units
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,884 3,712,800
kWh
Electricity Demand $91,287 13,378
kW-mo/yr
Electricity Fees $21,351 -
Natural Gas $181,958 17,395
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $211,300 2,509
lb
TOTAL YEARLY COSTS $763,780
RECOMMENDED SAVINGS* $256,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $3,943 $30,989 $819
11,781
kWh
$436
-
kW-mo/yr
$2,688
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $2,868 $20 $1,871
26,923
kWh
$997
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,841 $1,520 $2,260
32,513
kWh
$581
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $236,659 $2,614,888 $131,911
1,898,002
kWh
$104,748
-
kW-mo/yr
-
05 2.3212: Optimize plant power factor $10,128 $13,235 - $10,128
-
kW-mo/yr
-
TOTAL RECOMMENDED $256,439 $2,660,652 $136,861
1,969,219
kWh
$116,890
-
kW-mo/yr
$2,688
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs