| Assessment Year | 2023 |
|---|---|
| Principal Product | Kitchen and Bath cabinets |
| NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $50 M to 100M |
| # of Employees | 242 |
| Plant Area |
276,000
ft2
|
| Annual Production | 85,600
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $257,884 | 3,712,800 |
kWh
|
$0.069 | |
| Electricity Demand | $91,287 | 13,378 |
kW-mo/yr
|
$6.82 | |
| Electricity Fees | $21,351 | - |
|
- | |
| Natural Gas | $181,958 | 17,395 |
MMBtu
|
$10.46 | |
| Waste Disposal Costs | |||||
| Solid Waste (non-haz) | $211,300 | 2,509 |
lb
|
$84.22 | |
| TOTAL YEARLY COSTS | $763,780 | ||||
| RECOMMENDED SAVINGS* | $256,439 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $3,943 | $30,989 |
$819
11,781
kWh
|
$436
-
kW-mo/yr
|
$2,688
-
MMBtu
|
|
| 02 | 2.4239: Eliminate or reduce compressed air usage | $2,868 | $20 |
$1,871
26,923
kWh
|
$997
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,841 | $1,520 |
$2,260
32,513
kWh
|
$581
-
kW-mo/yr
|
- | |
| 04 | 2.9114: Use solar heat to make electricty | $236,659 | $2,614,888 |
$131,911
1,898,002
kWh
|
$104,748
-
kW-mo/yr
|
- | |
| 05 | 2.3212: Optimize plant power factor | $10,128 | $13,235 | - |
$10,128
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $256,439 | $2,660,652 |
$136,861
1,969,219
kWh
|
$116,890
-
kW-mo/yr
|
$2,688
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs