Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Seating and Restaurant Fixtures
NAICS
n/a
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 90,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,968 727,726
kWh
Natural Gas $4,969 1,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $17,978 $19,647 $17,978
244,431
kWh
02 2.7111: Reduce illumination to minimum necessary levels $1,531 $200 $1,531
20,809
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,446 - $1,446
22,274
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,058 $3,889 $1,058
14,361
kWh
TOTAL RECOMMENDED $22,013 $23,736 $22,013
301,875
kWh
TOTAL IMPLEMENTED $4,035 $4,089 $4,035
57,444
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs