Assessment Year | 2020 |
---|---|
Principal Product | plastic packaging and handling products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
227,000
ft2
|
Annual Production | 1,640,000
pieces
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,749,056 | 36,523,321 |
kWh
|
$0.048 | |
Electricity Demand | $790,178 | 73,723 |
kW-mo/yr
|
$10.72 | |
Natural Gas | $25,756 | 3,029 |
MMBtu
|
$8.50 | |
Waste Disposal Costs | |||||
Water Usage | $35,291 | 129 |
Tgal
|
$273.07 | |
Water Disposal | $36,360 | 129 |
Tgal
|
$281.34 | |
TOTAL YEARLY COSTS | $2,636,641 | ||||
RECOMMENDED SAVINGS* | $431,660 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $410,868 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,827 | $320 |
$4,444
92,800
kWh
|
$1,383
-
kW-mo/yr
|
- | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,246 | $6,782 |
$3,246
67,780
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,924 | $910 |
$6,830
142,662
kWh
|
$2,094
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,596 | $4,100 |
$1,981
41,366
kWh
|
$615
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $63,762 | $88,053 |
$38,842
809,222
kWh
|
$12,048
-
kW-mo/yr
|
- | - | $12,872 | |
06 | 2.7135: Install occupancy sensors | $230 | $780 |
$230
4,797
kWh
|
- | - | - | - | |
07 | 2.2628: Utilize a less expensive cooling method | $7,010 | $25,500 |
$7,010
146,376
kWh
|
- | - | - | - | |
08 | 2.3212: Optimize plant power factor | $328,879 | $538,653 | - |
$294,665
-
kW-mo/yr
|
$34,214 | - | - | |
09 | 2.2437: Recover waste heat from equipment | $11,186 | $28,360 | - | - | - |
$11,186
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $431,660 | $693,458 |
$62,583
1,305,003
kWh
|
$310,805
-
kW-mo/yr
|
$34,214 |
$11,186
-
MMBtu
|
$12,872 | ||
TOTAL IMPLEMENTED | $410,868 | $635,498 |
$53,592
1,117,261
kWh
|
$310,190
-
kW-mo/yr
|
$34,214 | - | $12,872 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs