ITAC Assessment: OR0552
ITAC logo
ITAC Assessment: OR0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Electricity
NAICS 221117: Biomass Electric Power Generation
SIC 4911: Electric Services
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 1,100,000
ft2
Annual Production 175,000,000
units
Production Hrs. Annual 6,552
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,065,501 19,095,000
kWh
Wood $5,169,290 2,510,798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $553,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.3321: Use steam pressure reduction to generate power $517,700 $1,250,000 - $517,700
-
MMBtu
02 2.4131: Size electric motors for peak operating efficiency $6,900 $20,000 $6,900
179,580
kWh
-
03 2.3191: Use demand controller or load shedder $9,900 $7,400 $9,900
257,800
kWh
-
04 2.7135: Install occupancy sensors $18,800 $16,200 $18,800
351,551
kWh
-
TOTAL RECOMMENDED $553,300 $1,293,600 $35,600
788,931
kWh
$517,700
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs