ITAC Assessment: WI0241
ITAC logo
ITAC Assessment: WI0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Lighting Fixtures
NAICS
n/a
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 55,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 2,550
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,620 419,109
kWh
Natural Gas $18,019 4,506
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $6,790 $880 - $6,790
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $2,075 $3,720 - $2,075
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,028 $1,850 - $1,028
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $473 $210 $473
6,155
kWh
-
05 2.7124: Make a practice of turning off lights when not needed $208 $160 $208
2,638
kWh
-
06 2.7135: Install occupancy sensors $166 $75 $166
2,345
kWh
-
TOTAL RECOMMENDED $10,740 $6,895 $847
11,138
kWh
$9,893
-
MMBtu
TOTAL IMPLEMENTED $1,501 $2,060 $473
6,155
kWh
$1,028
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs