ITAC Assessment: OR0550
ITAC logo
ITAC Assessment: OR0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Hardboard siding
NAICS 238170: Siding Contractors
SIC 1761: Roofing, Siding, and Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 350,000
ft2
Annual Production 75,000,000
thousand feet
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,416,347 49,590,760
kWh
Electricity Demand $353 117
kW-mo/yr
Natural Gas $980,153 127,055
MMBtu
Other Energy $4,796,849 562,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $580,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $457,667

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings
01 2.2135: Repair and eliminate steam leaks $435,946 $2,900 - $435,946
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,835 - $3,835
81,017
kWh
-
03 2.2424: Use heat in flue gases to preheat products or materials $60,786 $20,000 - $60,786
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,335 $11,100 $5,335
106,009
kWh
-
05 2.4133: Use most efficient type of electric motors $16,286 $42,778 $16,286
338,336
kWh
-
06 2.4226: Use / purchase optimum sized compressor $22,900 $12,750 $22,900
591,000
kWh
-
07 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,600 - $1,600
34,000
kWh
-
08 2.4224: Upgrade controls on compressors $24,600 $7,540 $24,600
525,000
kWh
-
09 2.4323: Use optimum size and capacity equipment $9,660 $1,330 $9,660
255,000
kWh
-
TOTAL RECOMMENDED $580,948 $98,398 $84,216
1,930,362
kWh
$496,732
-
MMBtu
TOTAL IMPLEMENTED $457,667 $45,678 $21,721
453,353
kWh
$435,946
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs