Assessment Year | 2009 |
---|---|
Principal Product | Particleboard |
NAICS | 321219: Reconstituted Wood Product Manufacturing |
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
450,000
ft2
|
Annual Production | 75,000
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,514,410 | 31,077,581 |
kWh
|
$0.049 |
Electricity Demand | $222,316 | 73,620 |
kW-mo/yr
|
$3.02 |
Electricity Fees | $120,314 | - |
|
- |
Natural Gas | $1,074,620 | 127,055 |
MMBtu
|
$8.46 |
Other Energy | $4,866,283 | 448,312 |
MMBtu
|
$10.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $261,217 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,482 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $170,135 | $100,000 | - | - | - | - | $375 | $800 | $168,960 | |
02 | 2.2442: Preheat combustion air with waste heat | $46,600 | $27,000 | - | - |
$46,600
-
MMBtu
|
- | - | - | - | |
03 | 2.1113: Reduce combustion air flow to optimum | $28,000 | $700 | - | - |
$28,000
-
MMBtu
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,682 | - |
$6,349
167,923
kWh
|
$1,333
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $8,800 | $3,500 | - | - | - |
$8,800
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $261,217 | $131,200 |
$6,349
167,923
kWh
|
$1,333
-
kW-mo/yr
|
$74,600
-
MMBtu
|
$8,800
-
MMBtu
|
$375 | $800 | $168,960 | ||
TOTAL IMPLEMENTED | $16,482 | $3,500 |
$6,349
167,923
kWh
|
$1,333
-
kW-mo/yr
|
- |
$8,800
-
MMBtu
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs