5,118
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0456 #03 Y:2004 | 03 | 2004 | Install / repair insulation on steam lines | $12,900 | $2,410 | |
| OR0456 #02 Y:2004 | 02 | 2004 | Keep boiler tubes clean | $37,240 | $1,760 | |
| OR0456 #01 Y:2004 | 01 | 2004 | Add/modify equipment to improve drying process | $(-1,300.0) | $5,000 | |
| OR0455 #06 Y:2004 | 06 | 2004 | Install / repair insulation on steam lines | $1,510 | $790 | |
| OR0455 #05 Y:2004 | 05 | 2004 | Establish burner maintenance schedule for boilers | $1,420 | $150 | |
| OR0455 #04 Y:2004 | 04 | 2004 | Install occupancy sensors | $2,140 | $1,750 | |
| OR0455 #03 Y:2004 | 03 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,670 | $6,670 | |
| OR0455 #02 Y:2004 | 02 | 2004 | Turn off equipment during breaks, reduce operating time | $9,570 | - | |
| OR0455 #01 Y:2004 | 01 | 2004 | Recover and reuse waste material | $45,100 | $16,200 | |
| OR0454 #04 Y:2004 | 04 | 2004 | Use water-based cutting fluids to eliminate need for solvent cleaning | $16,940 | $29,200 | |
| OR0454 #03 Y:2004 | 03 | 2004 | Eliminate old stock and modify inventory control | $5,720 | $13,080 | |
| OR0454 #02 Y:2004 | 02 | 2004 | Install sensors to detect defects | $24,900 | $2,600 | |
| OR0454 #01 Y:2004 | 01 | 2004 | Redesign process | $39,560 | - | |
| OR0453 #09 Y:2003 | 09 | 2003 | Optimize plant power factor | $3,020 | $4,500 | |
| OR0453 #08 Y:2003 | 08 | 2003 | Turn off equipment when not in use | $5,780 | $6,900 | |
| OR0453 #07 Y:2003 | 07 | 2003 | Make a practice of turning off lights when not needed | $11,370 | $1,000 | |
| OR0453 #06 Y:2003 | 06 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,400 | $6,400 | |
| OR0453 #05 Y:2003 | 05 | 2003 | Reduce the pressure of compressed air to the minimum required | $9,300 | $9,460 | |
| OR0453 #04 Y:2003 | 04 | 2003 | Develop standard procedures to improve internal yields | $113,000 | $84,300 | |
| OR0453 #03 Y:2003 | 03 | 2003 | Use adjustable frequency drive or multiple speed motors on existing system | $4,680 | $6,920 |