Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,118

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0456 #03 Y:2004 Install / repair insulation on steam lines $12,900 $2,410
OR0456 #02 Y:2004 Keep boiler tubes clean $37,240 $1,760
OR0456 #01 Y:2004 Add/modify equipment to improve drying process $(-1,300.0) $5,000
OR0455 #06 Y:2004 Install / repair insulation on steam lines $1,510 $790
OR0455 #05 Y:2004 Establish burner maintenance schedule for boilers $1,420 $150
OR0455 #04 Y:2004 Install occupancy sensors $2,140 $1,750
OR0455 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $6,670 $6,670
OR0455 #02 Y:2004 Turn off equipment during breaks, reduce operating time $9,570 -
OR0455 #01 Y:2004 Recover and reuse waste material $45,100 $16,200
OR0454 #04 Y:2004 Use water-based cutting fluids to eliminate need for solvent cleaning $16,940 $29,200
OR0454 #03 Y:2004 Eliminate old stock and modify inventory control $5,720 $13,080
OR0454 #02 Y:2004 Install sensors to detect defects $24,900 $2,600
OR0454 #01 Y:2004 Redesign process $39,560 -
OR0453 #09 Y:2003 Optimize plant power factor $3,020 $4,500
OR0453 #08 Y:2003 Turn off equipment when not in use $5,780 $6,900
OR0453 #07 Y:2003 Make a practice of turning off lights when not needed $11,370 $1,000
OR0453 #06 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $6,400 $6,400
OR0453 #05 Y:2003 Reduce the pressure of compressed air to the minimum required $9,300 $9,460
OR0453 #04 Y:2003 Develop standard procedures to improve internal yields $113,000 $84,300
OR0453 #03 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $4,680 $6,920