ITAC Assessment: OR0455
ITAC logo
ITAC Assessment: OR0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ultra Pure Chemicals
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 37,200
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,423 3,624,800
kWh
Electricity Demand $36,904 82,440
kW-mo/yr
Electricity Fees $11,936 -
Natural Gas $96,605 14,852
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Gaseous Waste Savings
01 3.5311: Recover and reuse waste material $45,100 $16,200 - - $45,100
-
lb
02 2.6212: Turn off equipment during breaks, reduce operating time $9,570 - - $9,570
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,670 $6,670 $6,670
109,000
kWh
- -
04 2.7135: Install occupancy sensors $2,140 $1,750 $2,140
39,600
kWh
- -
05 2.1231: Establish burner maintenance schedule for boilers $1,420 $150 - $1,420
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $1,510 $790 - $1,510
-
MMBtu
-
TOTAL RECOMMENDED $66,410 $25,560 $8,810
148,600
kWh
$12,500
-
MMBtu
$45,100
-
lb
TOTAL IMPLEMENTED $58,230 $18,100 $2,140
39,600
kWh
$10,990
-
MMBtu
$45,100
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs