ITAC Assessment: BD0168
ITAC logo
ITAC Assessment: BD0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Loader Attachments
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 33,000
ft2
Annual Production 8,750
units
Production Hrs. Annual 4,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,959 1,000,293
kWh
Electricity Demand $36,326 3,016
kW-mo/yr
Electricity Fees $292 -
Natural Gas $64,078 20,254
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7231: Use radiant heater for spot heating $7,663 $11,200 - - $7,663
-
MMBtu
- - - - -
02 2.2437: Recover waste heat from equipment $1,966 $2,169 $1,966
195,780
kWh
- - - - - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,647 $1,700 $909
20,809
kWh
$738
-
kW-mo/yr
- - - - - -
04 2.7135: Install occupancy sensors $1,632 $1,650 $716
16,413
kWh
$916
-
kW-mo/yr
- - - - - -
05 2.4133: Use most efficient type of electric motors $1,517 $2,790 $937
21,395
kWh
$580
-
kW-mo/yr
- - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $339 $318 $146
3,224
kWh
$55
-
kW-mo/yr
- - - - $138 -
07 2.4221: Install compressor air intakes in coolest locations $258 $400 $142
3,224
kWh
$116
-
kW-mo/yr
- - - - - -
08 2.4314: Use synthetic lubricant $216 $500 $120
2,638
kWh
$96
-
kW-mo/yr
- - - - - -
09 3.3131: Use evaporation to concentrate material $8,439 $32,000 - - - $8,439
-
Tgal
- - - -
10 4.431: Train operators for maximum operating efficiency $3,751 $3,000 - - - - $3,751
-
gal
- - -
11 3.5316: Contract a wood pallet recycling company $1,048 $100 - - - - - $1,048
-
lb
- -
12 3.4151: Minimize water usage $490 $1,000 - - - $490
-
Tgal
- - - -
13 3.5241: Sell used plates to an aluminum recycler $224 $400 - - - - - - - $224
14 4.441: Install automatic packing equipment $2,823 $6,000 - - - - - - - $2,823
15 4.821: Pay bills on time to avoid late fees $1,013 - - - - - - - - $1,013
TOTAL RECOMMENDED $33,026 $63,227 $4,936
263,483
kWh
$2,501
-
kW-mo/yr
$7,663
-
MMBtu
$8,929
-
Tgal
$3,751
-
gal
$1,048
-
lb
$138 $4,060
TOTAL IMPLEMENTED $33,026 $63,227 $4,936
263,483
kWh
$2,501
-
kW-mo/yr
$7,663
-
MMBtu
$8,929
-
Tgal
$3,751
-
gal
$1,048
-
lb
$138 $4,060
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs