Assessment Year | 2000 |
---|---|
Principal Product | Loader Attachments |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
33,000
ft2
|
Annual Production | 8,750
units
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,959 | 1,000,293 |
kWh
|
$0.044 |
Electricity Demand | $36,326 | 3,016 |
kW-mo/yr
|
$12.04 |
Electricity Fees | $292 | - |
|
- |
Natural Gas | $64,078 | 20,254 |
MMBtu
|
$3.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,026 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,026 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $7,663 | $11,200 | - | - |
$7,663
-
MMBtu
|
- | - | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $1,966 | $2,169 |
$1,966
195,780
kWh
|
- | - | - | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,647 | $1,700 |
$909
20,809
kWh
|
$738
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.7135: Install occupancy sensors | $1,632 | $1,650 |
$716
16,413
kWh
|
$916
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,517 | $2,790 |
$937
21,395
kWh
|
$580
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $339 | $318 |
$146
3,224
kWh
|
$55
-
kW-mo/yr
|
- | - | - | - | $138 | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $258 | $400 |
$142
3,224
kWh
|
$116
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 2.4314: Use synthetic lubricant | $216 | $500 |
$120
2,638
kWh
|
$96
-
kW-mo/yr
|
- | - | - | - | - | - | |
09 | 3.3131: Use evaporation to concentrate material | $8,439 | $32,000 | - | - | - |
$8,439
-
Tgal
|
- | - | - | - | |
10 | 4.431: Train operators for maximum operating efficiency | $3,751 | $3,000 | - | - | - | - |
$3,751
-
gal
|
- | - | - | |
11 | 3.5316: Contract a wood pallet recycling company | $1,048 | $100 | - | - | - | - | - |
$1,048
-
lb
|
- | - | |
12 | 3.4151: Minimize water usage | $490 | $1,000 | - | - | - |
$490
-
Tgal
|
- | - | - | - | |
13 | 3.5241: Sell used plates to an aluminum recycler | $224 | $400 | - | - | - | - | - | - | - | $224 | |
14 | 4.441: Install automatic packing equipment | $2,823 | $6,000 | - | - | - | - | - | - | - | $2,823 | |
15 | 4.821: Pay bills on time to avoid late fees | $1,013 | - | - | - | - | - | - | - | - | $1,013 | |
TOTAL RECOMMENDED | $33,026 | $63,227 |
$4,936
263,483
kWh
|
$2,501
-
kW-mo/yr
|
$7,663
-
MMBtu
|
$8,929
-
Tgal
|
$3,751
-
gal
|
$1,048
-
lb
|
$138 | $4,060 | ||
TOTAL IMPLEMENTED | $33,026 | $63,227 |
$4,936
263,483
kWh
|
$2,501
-
kW-mo/yr
|
$7,663
-
MMBtu
|
$8,929
-
Tgal
|
$3,751
-
gal
|
$1,048
-
lb
|
$138 | $4,060 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (haz) Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs