1,112
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0821 #05 Y:2025 | 05 | 2025 | Install timers on light switches in little used areas | $3,444 | $16,650 | |
| OR0821 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $10,035 | $1,456 | |
| OR0821 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,774 | $3,661 | |
| OR0821 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $14,423 | - | |
| OR0821 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $19,865 | - | |
| OR0819 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $4,398 | $71,252 | |
| OR0819 #02 Y:2025 | 02 | 2025 | Use optimum thickness insulation | $1,005 | $9,448 | |
| OR0819 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $16,460 | $11,702 | |
| OR0818 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $29,217 | $421,610 | |
| OR0818 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,920 | - | |
| OR0818 #01 Y:2025 | 01 | 2025 | Eliminate or reduce compressed air usage | $7,742 | - | |
| OR0800 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,775 | $10,104 | |
| OR0800 #03 Y:2024 | 03 | 2024 | Use solar heat to make electricty | $77,631 | $300,000 | |
| OR0800 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,219 | $9,036 | |
| OR0800 #01 Y:2024 | 01 | 2024 | Minimize operation of equipment maintained in standby condition | $5,407 | - | |
| OR0777 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $2,570 | - | |
| OR0777 #02 Y:2023 | 02 | 2023 | Install common header on compressors | $2,832 | $6,989 | |
| OR0777 #01 Y:2023 | 01 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $8,479 | - | |
| OR0738 #03 Y:2021 | 03 | 2021 | Utilize energy-efficient belts and other improved mechanisms | $1,831 | $1,000 | |
| OR0738 #02 Y:2021 | 02 | 2021 | Optimize plant power factor | $13,131 | $8,725 |