Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Malt processing
NAICS 311213: Malt Manufacturing
SIC 2083: Malt
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 350,000
ft2
Annual Production 3,036,000
bushels
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $604,249 12,935,590
kWh
Electricity Demand $176,773 29,758
kW-mo/yr
Electricity Fees $30,200 -
Natural Gas $1,251,693 258,828
MMBtu
TOTAL YEARLY COSTS $2,062,915
RECOMMENDED SAVINGS* $13,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,881

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,479 - $8,479
181,533
kWh
-
02 2.4225: Install common header on compressors $2,832 $6,989 $2,832
60,620
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $2,570 - $2,189
46,866
kWh
$381
-
kW-mo/yr
TOTAL RECOMMENDED $13,881 $6,989 $13,500
289,019
kWh
$381
-
kW-mo/yr
TOTAL IMPLEMENTED $13,881 $6,989 $13,500
289,019
kWh
$381
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs