Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Oil and Valve Stem Seals
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 115,500
ft2
Annual Production 90,000,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $801,284 14,361,665
kWh
Natural Gas $10,484 1,613
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $6,630 $5,000 $6,630
-
kWh
02 2.4133: Use most efficient type of electric motors $2,470 $6,520 $2,470
44,256
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,860 $1,150 $5,860
105,217
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,170 $32,530 $12,170
218,054
kWh
05 2.2691: Shut off cooling if cold outside air will cool process $7,600 $2,550 $7,600
196,073
kWh
06 2.2514: Cover open tanks $2,280 $740 $2,280
102,579
kWh
TOTAL RECOMMENDED $37,010 $48,490 $37,010
666,179
kWh
TOTAL IMPLEMENTED $20,500 $40,200 $20,500
367,527
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs