| Assessment Year | 2025 |
|---|---|
| Principal Product | ceramic and glass tiles |
| NAICS | 327120: Clay Building Material and Refractories Manufacturing |
| SIC | 3253: Ceramic Wall and Floor Tile |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
115,000
ft2
|
| Annual Production | 750,000
units
|
| Production Hrs. Annual | 2,550
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $170,582 | 1,736,732 |
kWh
|
$0.098 | |
| Electricity Demand | $44,989 | 6,665 |
kW-mo/yr
|
$6.75 | |
| Electricity Fees | $16,245 | - |
|
- | |
| Natural Gas | $332,479 | 56,257 |
MMBtu
|
$5.91 | |
| Waste Disposal Costs | |||||
| Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
| TOTAL YEARLY COSTS | $564,295 | ||||
| RECOMMENDED SAVINGS* | $21,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,460 | $11,702 |
$14,529
147,922
kWh
|
$1,931
-
kW-mo/yr
|
- | |
| 02 | 2.2515: Use optimum thickness insulation | $1,005 | $9,448 | - | - |
$1,005
-
MMBtu
|
|
| 03 | 2.9114: Use solar heat to make electricty | $4,398 | $71,252 |
$4,162
42,376
kWh
|
$236
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $21,863 | $92,402 |
$18,691
190,298
kWh
|
$2,167
-
kW-mo/yr
|
$1,005
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs