ITAC Assessment: OR0819
ITAC logo
ITAC Assessment: OR0819
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product ceramic and glass tiles
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 115,000
ft2
Annual Production 750,000
units
Production Hrs. Annual 2,550
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,582 1,736,732
kWh
Electricity Demand $44,989 6,665
kW-mo/yr
Electricity Fees $16,245 -
Natural Gas $332,479 56,257
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $564,295
RECOMMENDED SAVINGS* $21,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,460 $11,702 $14,529
147,922
kWh
$1,931
-
kW-mo/yr
-
02 2.2515: Use optimum thickness insulation $1,005 $9,448 - - $1,005
-
MMBtu
03 2.9114: Use solar heat to make electricty $4,398 $71,252 $4,162
42,376
kWh
$236
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,863 $92,402 $18,691
190,298
kWh
$2,167
-
kW-mo/yr
$1,005
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs