| Assessment Year | 2003 |
|---|---|
| Principal Product | Beer and Root Beer |
| NAICS | 312120: Breweries |
| SIC | 2082: Malt Beverages |
| Sales Range | $5 M to 10M |
| # of Employees | 30 |
| Plant Area |
25,000
ft2
|
| Annual Production | 200,000
Tgal
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,201 | 1,650,346 |
kWh
|
$0.041 |
| Electricity Demand | $41,185 | 5,455 |
kW-mo/yr
|
$7.55 |
| Electricity Fees | $4,135 | - |
|
- |
| Natural Gas | $62,633 | 11,720 |
MMBtu
|
$5.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,252 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,102 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.821: Pay bills on time to avoid late fees | $2,891 | $30 | - | - | $2,891 | - | |
| 02 | 2.6218: Turn off equipment when not in use | $1,834 | $900 |
$1,178
28,495
kWh
|
$589
-
kW-mo/yr
|
$67 | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,316 | $105 |
$906
21,910
kWh
|
$362
-
kW-mo/yr
|
$48 | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,005 | $15 |
$704
17,037
kWh
|
$264
-
kW-mo/yr
|
$37 | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $898 | $440 |
$865
20,927
kWh
|
- | $33 | - | |
| 06 | 2.7134: Use photocell controls | $253 | $56 |
$138
3,332
kWh
|
$106
-
kW-mo/yr
|
$9 | - | |
| 07 | 2.2511: Insulate bare equipment | $55 | $98 | - | - | - |
$55
-
MMBtu
|
|
| TOTAL RECOMMENDED | $8,252 | $1,644 |
$3,791
91,701
kWh
|
$1,321
-
kW-mo/yr
|
$3,085 |
$55
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $5,102 | $639 |
$1,707
41,296
kWh
|
$370
-
kW-mo/yr
|
$2,970 |
$55
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs