Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Beer and Root Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 200,000
Tgal
Production Hrs. Annual 6,864
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,201 1,650,346
kWh
Electricity Demand $41,185 5,455
kW-mo/yr
Electricity Fees $4,135 -
Natural Gas $62,633 11,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 4.821: Pay bills on time to avoid late fees $2,891 $30 - - $2,891 -
02 2.6218: Turn off equipment when not in use $1,834 $900 $1,178
28,495
kWh
$589
-
kW-mo/yr
$67 -
03 2.7111: Reduce illumination to minimum necessary levels $1,316 $105 $906
21,910
kWh
$362
-
kW-mo/yr
$48 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,005 $15 $704
17,037
kWh
$264
-
kW-mo/yr
$37 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $898 $440 $865
20,927
kWh
- $33 -
06 2.7134: Use photocell controls $253 $56 $138
3,332
kWh
$106
-
kW-mo/yr
$9 -
07 2.2511: Insulate bare equipment $55 $98 - - - $55
-
MMBtu
TOTAL RECOMMENDED $8,252 $1,644 $3,791
91,701
kWh
$1,321
-
kW-mo/yr
$3,085 $55
-
MMBtu
TOTAL IMPLEMENTED $5,102 $639 $1,707
41,296
kWh
$370
-
kW-mo/yr
$2,970 $55
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs