ITAC Assessment: OR0305
ITAC logo
ITAC Assessment: OR0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Motor coaches
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 534
Plant Area 435,600
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,184 2,925,264
kWh
Electricity Demand $36,819 8,916
kW-mo/yr
Electricity Fees $2,061 -
Natural Gas $59,065 17,526
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 3.1192: Reduce scrap production $89,400 $15,300 - - - - $16,500 $72,900
02 3.6192: Use a less expensive method of waste removal $24,200 $139,000 - - $24,200
-
Tgal
- - -
03 4.513: Re-arrange equipment layout to reduce labor costs $4,130 $1,200 - - - - $4,130 -
04 3.2121: Convert to electrostatic powder coating $8,400 $4,900 - - - - - $8,400
05 4.211: Consider use / purchase of bulk materials where possible $1,990 - - - - $60
-
lb
- $1,930
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,860 $2,500 $1,250
26,377
kWh
$610
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $129,980 $162,900 $1,250
26,377
kWh
$610
-
kW-mo/yr
$24,200
-
Tgal
$60
-
lb
$20,630 $83,230
TOTAL IMPLEMENTED $16,380 $8,600 $1,250
26,377
kWh
$610
-
kW-mo/yr
- $60
-
lb
$4,130 $10,330
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs