| Assessment Year | 1997 |
|---|---|
| Principal Product | Motor coaches |
| NAICS |
n/a
|
| SIC | 3711: Motor Vehicles and Passenger Car Bodies |
| Sales Range | $100 M to 500M |
| # of Employees | 534 |
| Plant Area |
435,600
ft2
|
| Annual Production | 500
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $138,184 | 2,925,264 |
kWh
|
$0.047 |
| Electricity Demand | $36,819 | 8,916 |
kW-mo/yr
|
$4.13 |
| Electricity Fees | $2,061 | - |
|
- |
| Natural Gas | $59,065 | 17,526 |
MMBtu
|
$3.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $129,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,380 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.1192: Reduce scrap production | $89,400 | $15,300 | - | - | - | - | $16,500 | $72,900 | |
| 02 | 3.6192: Use a less expensive method of waste removal | $24,200 | $139,000 | - | - |
$24,200
-
Tgal
|
- | - | - | |
| 03 | 4.513: Re-arrange equipment layout to reduce labor costs | $4,130 | $1,200 | - | - | - | - | $4,130 | - | |
| 04 | 3.2121: Convert to electrostatic powder coating | $8,400 | $4,900 | - | - | - | - | - | $8,400 | |
| 05 | 4.211: Consider use / purchase of bulk materials where possible | $1,990 | - | - | - | - |
$60
-
lb
|
- | $1,930 | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,860 | $2,500 |
$1,250
26,377
kWh
|
$610
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $129,980 | $162,900 |
$1,250
26,377
kWh
|
$610
-
kW-mo/yr
|
$24,200
-
Tgal
|
$60
-
lb
|
$20,630 | $83,230 | ||
| TOTAL IMPLEMENTED | $16,380 | $8,600 |
$1,250
26,377
kWh
|
$610
-
kW-mo/yr
|
- |
$60
-
lb
|
$4,130 | $10,330 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs