| Assessment Year | 1995 |
|---|---|
| Principal Product | Computer Chips |
| NAICS |
n/a
|
| SIC | 3674: Semiconductors and Related Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
60,000
ft2
|
| Annual Production | 12,000,000
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $333,393 | 3,508,206 |
kWh
|
$0.095 |
| Natural Gas | $40,524 | 6,535 |
MMBtu
|
$6.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,226 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,169 | $722 |
$1,169
12,309
kWh
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,319 | $41,870 |
$10,319
108,441
kWh
|
|
| 03 | 2.7132: Install timers on light switches in little used areas | $4,812 | $3,400 |
$4,812
50,703
kWh
|
|
| 04 | 2.7135: Install occupancy sensors | $116 | $110 |
$116
1,172
kWh
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $973 | $859 |
$973
10,258
kWh
|
|
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,161 | $6,220 |
$11,161
117,526
kWh
|
|
| 07 | 2.6218: Turn off equipment when not in use | $2,430 | $2,760 |
$2,430
25,498
kWh
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $272 | $360 |
$272
2,931
kWh
|
|
| 09 | 2.4239: Eliminate or reduce compressed air usage | $1,288 | $1,670 |
$1,288
12,896
kWh
|
|
| TOTAL RECOMMENDED | $32,540 | $57,971 |
$32,540
341,734
kWh
|
||
| TOTAL IMPLEMENTED | $7,226 | $5,341 |
$7,226
76,201
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs