ITAC Assessment: IA0041
ITAC logo
ITAC Assessment: IA0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CARDBOARD BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 575,000
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,069 3,621,337
kWh
Natural Gas $145,428 107,548
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $20,185 $81,000 - $20,185
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $8,582 $3,000 - $8,582
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,582 $1,106 $2,688
44,549
kWh
- $(-1,106.0)
04 2.6232: Install set-back timers $148 $414 $148
2,345
kWh
- -
05 2.2136: Install / repair insulation on steam lines $81 $188 - $81
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $163 $150 $163
2,638
kWh
- -
TOTAL RECOMMENDED $30,741 $85,858 $2,999
49,532
kWh
$28,848
-
MMBtu
$(-1,106.0)
TOTAL IMPLEMENTED $30,430 $85,294 $2,688
44,549
kWh
$28,848
-
MMBtu
$(-1,106.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs