| Assessment Year | 1992 |
|---|---|
| Principal Product | AL AND ZN DIE CASTS |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 58 |
| Plant Area |
n/a
|
| Annual Production | 914,000
lb
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $145,977 | 1,254,103 |
kWh
|
$0.12 |
| Natural Gas | $97,442 | 24,524 |
MMBtu
|
$3.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,066 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,013 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $1,182 | $750 |
$1,182
10,258
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $309 | - |
$309
2,638
kWh
|
- | - | |
| 03 | 2.6232: Install set-back timers | $865 | $199 |
$865
7,620
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $832 | - |
$904
7,913
kWh
|
- | $(-72.0) | |
| 05 | 2.4312: Improve lubrication practices | $4,228 | - |
$4,228
36,342
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,006 | - |
$1,006
8,792
kWh
|
- | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,172 | - |
$11,172
-
kWh
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,657 | $2,500 | - |
$5,657
-
MMBtu
|
- | |
| 09 | 2.1122: Re-size charging openings or add a movable door on equipment | $3,815 | - | - |
$3,815
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $29,066 | $3,449 |
$19,666
73,563
kWh
|
$9,472
-
MMBtu
|
$(-72.0) | ||
| TOTAL IMPLEMENTED | $8,013 | $3,449 |
$2,356
20,516
kWh
|
$5,657
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs