ITAC Assessment: OR0821
ITAC logo
ITAC Assessment: OR0821
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Windows
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 327,000
ft2
Annual Production 450,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $840,359 9,825,114
kWh
Electricity Demand $219,277 18,706
kW-mo/yr
Natural Gas $27,372 2,078
MMBtu
TOTAL YEARLY COSTS $1,087,008
RECOMMENDED SAVINGS* $59,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,865 - $8,412
98,357
kWh
$1,579
-
kW-mo/yr
$9,874
02 2.4239: Eliminate or reduce compressed air usage $14,423 - $14,423
168,630
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,774 $3,661 $9,913
115,906
kWh
$1,861
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,035 $1,456 $8,449
98,787
kWh
$1,586
-
kW-mo/yr
-
05 2.7132: Install timers on light switches in little used areas $3,444 $16,650 $3,444
40,270
kWh
- -
TOTAL RECOMMENDED $59,541 $21,767 $44,641
521,950
kWh
$5,026
-
kW-mo/yr
$9,874
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs