ITAC Assessment: WV0542
ITAC logo
ITAC Assessment: WV0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Scissor Lift and Aerial Lifts
NAICS 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 325,000
ft2
Annual Production 4,000
units
Production Hrs. Annual 7,344
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,186 3,441,096
kWh
Electricity Demand $28,457 7,431
kW-mo/yr
Electricity Fees $8,830 -
Natural Gas $27,178 8,999
MMBtu
Waste Disposal Costs
Water Usage $1,237 245
Tgal
Water Disposal $1,444 245
Tgal
Other Liquid (non-haz) $33,600 168,000
gal
TOTAL YEARLY COSTS $314,932
RECOMMENDED SAVINGS* $47,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,818

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 3.3131: Use evaporation to concentrate material $9,150 $45,000 - - - - - $33,600
-
gal
$(-16,800.0) $(-7,650.0)
02 2.7135: Install occupancy sensors $5,206 $5,330 $4,731
76,061
kWh
$475
-
kW-mo/yr
- - - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,056 $765 $4,662
74,956
kWh
$394
-
kW-mo/yr
- - - - - -
04 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $4,841 $16,500 $3,105
49,913
kWh
$1,126
-
kW-mo/yr
$610
-
MMBtu
- - - - -
05 2.4322: Use or replace with energy efficient substitutes $4,681 $2,700 - - $4,681
-
MMBtu
- - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,665 - $4,240
68,173
kWh
$425
-
kW-mo/yr
- - - - - -
07 2.1321: Replace fossil fuel equipment with electrical equipment $3,828 $1,800 $(-1,028.0)
(-16,524)
kWh
$(-103.0)
-
kW-mo/yr
$4,959
-
MMBtu
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,984 $9,625 $2,551
40,998
kWh
$433
-
kW-mo/yr
- - - - - -
09 3.4151: Minimize water usage $2,251 $7,000 - - - $1,237
-
Tgal
$1,444
-
Tgal
- $(-430.0) -
10 2.4239: Eliminate or reduce compressed air usage $1,131 $883 $1,028
16,524
kWh
$103
-
kW-mo/yr
- - - - - -
11 2.4151: Develop a repair/replace policy $963 $940 $1,349
21,685
kWh
$114
-
kW-mo/yr
- - - - - $(-500.0)
12 2.7142: Utilize higher efficiency lamps and/or ballasts $955 $2,135 $844
13,573
kWh
$111
-
kW-mo/yr
- - - - - -
13 2.4231: Reduce the pressure of compressed air to the minimum required $926 $100 $853
13,712
kWh
$73
-
kW-mo/yr
- - - - - -
14 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $881 $2,150 $801
12,871
kWh
$80
-
kW-mo/yr
- - - - - -
15 2.7447: Install vinyl strip / high speed / air curtain doors $48 $105 - - $48
-
MMBtu
- - - - -
TOTAL RECOMMENDED $47,566 $95,033 $23,136
371,942
kWh
$3,231
-
kW-mo/yr
$10,298
-
MMBtu
$1,237
-
Tgal
$1,444
-
Tgal
$33,600
-
gal
$(-17,230.0) $(-8,150.0)
TOTAL IMPLEMENTED $28,818 $29,478 $20,258
325,682
kWh
$2,128
-
kW-mo/yr
$4,681
-
MMBtu
$1,237
-
Tgal
$1,444
-
Tgal
- $(-430.0) $(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs