Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

949

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OD0174 #04 Y:2000 Meter waste water $4,925 $2,156
OD0174 #03 Y:2000 Reduce space conditioning during non-working hours $1,307 $2,000
OD0174 #02 Y:2000 Analyze flue gas for proper air/fuel ratio $864 $1,000
OD0174 #01 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $1,705 $2,700
OD0175 #02 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $800 $520
OD0175 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $27,794 $49,324
OD0173 #03 Y:2000 Reduce ventilation air $634 $252
OD0173 #02 Y:2000 Use synthetic lubricant $1,068 $442
OD0173 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $2,398 $2,860
OD0172 #03 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $2,087 $1,800
OD0172 #02 Y:2000 Repair or replace steam traps $19,058 $2,100
OD0172 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $89,664 $154,663
OD0171 #02 Y:2000 Recharge batteries on during off-peak demand periods $567 -
OD0171 #01 Y:2000 Recover heat from exhausted steam, hot air or hot water $22,439 $93,700
OD0170 #04 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $795 $1,000
OD0170 #03 Y:2000 Utilize energy-efficient belts and other improved mechanisms $642 $726
OD0170 #02 Y:2000 Install timers and/or thermostats $1,337 $115
OD0170 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $5,359 $5,892
OD0166 #04 Y:2000 Meter waste water $20,038 $6,955
OD0166 #03 Y:2000 Adjust / maintain fork lift trucks for most efficient operation $13,669 $113,000