Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

775

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0129 #05 Y:2026 Install occupancy sensors $778 $1,744
NL0129 #04 Y:2026 Apply for tax-free status for energy purchases $8,173 $264
NL0129 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,072 $41,500
NL0129 #02 Y:2026 Upgrade obsolete equipment $226,046 $346,302
NL0129 #01 Y:2026 Add equipment/ operators to reduce production bottleneck $15,722,064 $5,073,962
NL0128 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,832 $3,600
NL0128 #05 Y:2026 Use optimum temperature $12,756 $40,000
NL0128 #04 Y:2026 Air condition only space necessary $13,467 $7,019
NL0128 #03 Y:2026 Meter waste water $18,726 $15,000
NL0128 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $41,428 $20,000
NL0128 #01 Y:2026 Apply a protective coating to racks and tanks $103,072 $2,040
NL0127 #08 Y:2026 Close holes and openings in building such as broken windows $71 $65
NL0127 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $151 $250
NL0127 #06 Y:2026 Install timers and/or thermostats $347 $644
NL0127 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,352 $2,746
NL0127 #04 Y:2026 Eliminate or reduce compressed air usage $1,664 $3,007
NL0127 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,157 $29,281
NL0127 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $10,443 $5,000
NL0127 #01 Y:2026 Use closed cycle process to minimize waste water production $14,253 $29,883
NL0126 #06 Y:2026 Turn off equipment when not in use $1,150 $300