Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

713

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0120 #06 Y:2025 Use photocell controls $52 $76
NL0120 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $185 $240
NL0120 #04 Y:2025 Use proper thickness of insulation on building envelope $432 $2,440
NL0120 #03 Y:2025 Use demand controller or load shedder $1,312 $960
NL0120 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,394 $5,536
NL0120 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,056 $9,000
NL0118 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $634 $608
NL0118 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $636 $165
NL0118 #03 Y:2025 Meter waste water $857 $985
NL0118 #02 Y:2025 Meter waste water $3,352 $1,575
NL0118 #01 Y:2025 Recharge batteries on during off-peak demand periods $15,441 $550
NL0117 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $112 $260
NL0117 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $293 $70
NL0117 #04 Y:2025 Apply for tax-free status for energy purchases $366 $120
NL0117 #03 Y:2025 Use or replace with energy efficient substitutes $523 $1,530
NL0117 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,209 $600
NL0117 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,626 $11,440
NL0116 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $411 $423
NL0116 #05 Y:2025 Insulate bare equipment $566 $655
NL0116 #04 Y:2025 Install compressor air intakes in coolest locations $828 $4,650