ITAC Assessment: NL0108
ITAC logo
ITAC Assessment: NL0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Concrete Plants
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 115,607
ft2
Annual Production 290
units
Production Hrs. Annual 5,000
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,966 937,442
kWh
Electricity Demand $27,124 3,855
kW-mo/yr
Electricity Fees $7,504 -
Natural Gas $31,022 3,408
MMBtu
Waste Disposal Costs
Water Usage $2,830 767
Tgal
Water Disposal $4,250 767
Tgal
Other Liquid (non-haz) $496 1
gal
TOTAL YEARLY COSTS $132,192
RECOMMENDED SAVINGS* $606,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $510,000 $2,500,000 - - - $510,000
02 2.4321: Upgrade obsolete equipment $93,844 $220,000 $344
5,460
kWh
$93,500 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,935 $695 $2,435
38,650
kWh
$(-400.0) $(-100.0) -
04 2.7135: Install occupancy sensors $686 $1,621 $686
10,880
kWh
- - -
TOTAL RECOMMENDED $606,465 $2,722,316 $3,465
54,990
kWh
$93,100 $(-100.0) $510,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs