ITAC Assessment: NL0106
ITAC logo
ITAC Assessment: NL0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Lottery Tickets
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 129,940
ft2
Annual Production 2,400,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,559 2,788,700
kWh
Electricity Demand $39,601 7,131
kW-mo/yr
Electricity Fees $9,594 -
Natural Gas $9,869 1,350
MMBtu
Other Gas $384 1
MMBtu
Waste Disposal Costs
Water Usage $4,155 1,005
Tgal
Water Disposal $6,164 1,005
Tgal
Other Liquid (non-haz) $681 1
gal
TOTAL YEARLY COSTS $241,007
RECOMMENDED SAVINGS* $21,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,202 $125 $10,102
165,610
kWh
- - $(-800.0) $(-100.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,713 $5,826 $3,241
53,127
kWh
$567
-
kW-mo/yr
- $905 -
03 2.8121: Apply for tax-free status for energy purchases $2,899 $2,000 - - $2,899 - -
04 2.4224: Upgrade controls on compressors $2,086 $675 $2,086
34,193
kWh
- - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,863 $25 - $1,863
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $398 $100 $398
6,530
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $203 $303 $83
1,367
kWh
$11
-
kW-mo/yr
- $109 -
TOTAL RECOMMENDED $21,364 $9,054 $15,910
260,827
kWh
$2,441
-
kW-mo/yr
$2,899 $214 $(-100.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs