Assessment Year | 2001 |
---|---|
Principal Product | Aluminum extrusion |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
46,736
ft2
|
Annual Production | 24,000,000
lb
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $211,141 | 2,860,364 |
kWh
|
$0.074 |
Electricity Demand | $57,363 | 7,594 |
kW-mo/yr
|
$7.55 |
Electricity Fees | $4,121 | - |
|
- |
Natural Gas | $121,977 | 20,183 |
MMBtu
|
$6.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $234,598 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7134: Use photocell controls | $3,062 | $1,000 |
$1,771
24,000
kWh
|
$1,291
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.6218: Turn off equipment when not in use | $469 | $100 |
$469
6,355
kWh
|
- | - | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,529 | $320 |
$7,213
97,730
kWh
|
$1,316
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.2511: Insulate bare equipment | $419 | $250 | - | - |
$419
-
MMBtu
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $8,279 | $10,000 | - | - |
$8,279
-
MMBtu
|
- | - | - | - | |
06 | 3.1192: Reduce scrap production | $92,084 | $30,000 | - | - | - |
$92,084
-
lb
|
- | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,791 | $7,900 | - | - | - | - | - | $(-100.0) | $7,891 | |
08 | 4.445: Install equipment to move product | $69,200 | $50,000 | - | - | - | - | $76,200 | $(-7,000.0) | - | |
09 | 4.445: Install equipment to move product | $43,085 | $55,000 | - | - | - | - | $50,085 | $(-7,000.0) | - | |
10 | 4.652: Replace existing equipment with more suitable substitutes | $1,680 | $200 | - | - | - | - | $1,680 | - | - | |
TOTAL RECOMMENDED | $234,598 | $154,770 |
$9,453
128,085
kWh
|
$2,607
-
kW-mo/yr
|
$8,698
-
MMBtu
|
$92,084
-
lb
|
$127,965 | $(-14,100.0) | $7,891 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs