ITAC Assessment: SD0276
ITAC logo
ITAC Assessment: SD0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum extrusion
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 46,736
ft2
Annual Production 24,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,141 2,860,364
kWh
Electricity Demand $57,363 7,594
kW-mo/yr
Electricity Fees $4,121 -
Natural Gas $121,977 20,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $234,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7134: Use photocell controls $3,062 $1,000 $1,771
24,000
kWh
$1,291
-
kW-mo/yr
- - - - -
02 2.6218: Turn off equipment when not in use $469 $100 $469
6,355
kWh
- - - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,529 $320 $7,213
97,730
kWh
$1,316
-
kW-mo/yr
- - - - -
04 2.2511: Insulate bare equipment $419 $250 - - $419
-
MMBtu
- - - -
05 2.2437: Recover waste heat from equipment $8,279 $10,000 - - $8,279
-
MMBtu
- - - -
06 3.1192: Reduce scrap production $92,084 $30,000 - - - $92,084
-
lb
- - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,791 $7,900 - - - - - $(-100.0) $7,891
08 4.445: Install equipment to move product $69,200 $50,000 - - - - $76,200 $(-7,000.0) -
09 4.445: Install equipment to move product $43,085 $55,000 - - - - $50,085 $(-7,000.0) -
10 4.652: Replace existing equipment with more suitable substitutes $1,680 $200 - - - - $1,680 - -
TOTAL RECOMMENDED $234,598 $154,770 $9,453
128,085
kWh
$2,607
-
kW-mo/yr
$8,698
-
MMBtu
$92,084
-
lb
$127,965 $(-14,100.0) $7,891
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs