ITAC Assessment: NL0107
ITAC logo
ITAC Assessment: NL0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Potable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 2,000
ft2
Annual Production 2,600,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $410,752 4,238,616
kWh
TOTAL YEARLY COSTS $410,752
RECOMMENDED SAVINGS* $46,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,651 $66,700 $23,651
243,822
kWh
- - -
02 2.4133: Use most efficient type of electric motors $21,036 $165,000 $17,197
177,289
kWh
- $3,425 $414
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,532 $2,280 $1,601
16,508
kWh
$(-69.0)
-
MMBtu
- -
04 2.7444: Close holes and openings in building such as broken windows $109 $30 $109
1,124
kWh
- - -
TOTAL RECOMMENDED $46,328 $234,010 $42,558
438,743
kWh
$(-69.0)
-
MMBtu
$3,425 $414
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs