Assessment Year | 2009 |
---|---|
Principal Product | Photographic Chemicals |
NAICS | 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
111,553
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $339,167 | 5,391,360 |
kWh
|
$0.063 |
Electricity Fees | $54,700 | - |
|
- |
Natural Gas | $554,957 | 45,043 |
MMBtu
|
$12.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $201,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $118,916 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,230 | $10,800 |
$7,800
106,811
kWh
|
$1,780
-
kW-mo/yr
|
- | - | $1,650 | |
02 | 2.2113: Repair or replace steam traps | $78,500 | $40,000 | - | - |
$78,500
-
MMBtu
|
- | - | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $45,100 | $15,000 | - | - | - |
$45,100
-
MMBtu
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $18,000 | $36,000 | - | - |
$18,000
-
MMBtu
|
- | - | |
05 | 2.2121: Increase amount of condensate returned | $7,848 | $8,000 | - | - |
$7,848
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,616 | $2,500 |
$7,616
120,896
kWh
|
- | - | - | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $8,200 | - | - | - | - | - | $8,200 | |
08 | 2.4226: Use / purchase optimum sized compressor | $24,600 | $27,800 |
$24,600
326,748
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $201,094 | $140,100 |
$40,016
554,455
kWh
|
$1,780
-
kW-mo/yr
|
$104,348
-
MMBtu
|
$45,100
-
MMBtu
|
$9,850 | ||
TOTAL IMPLEMENTED | $118,916 | $70,300 |
$32,216
447,644
kWh
|
- |
$78,500
-
MMBtu
|
- | $8,200 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs