3,985
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0361 #08 Y:2007 | 08 | 2007 | Adjust burners for efficient operation | $452 | $500 | |
| NC0361 #07 Y:2007 | 07 | 2007 | Adjust burners for efficient operation | $1,150 | $1,200 | |
| NC0361 #06 Y:2007 | 06 | 2007 | Adjust burners for efficient operation | $1,849 | $1,200 | |
| NC0361 #05 Y:2007 | 05 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $579 | $100 | |
| NC0361 #04 Y:2007 | 04 | 2007 | Develop a repair/replace policy | $658 | $617 | |
| NC0361 #03 Y:2007 | 03 | 2007 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $6,894 | $19,950 | |
| NC0361 #02 Y:2007 | 02 | 2007 | Utilize higher efficiency lamps and/or ballasts | $1,791 | $1,674 | |
| NC0361 #01 Y:2007 | 01 | 2007 | Utilize higher efficiency lamps and/or ballasts | $6,209 | $1,540 | |
| NC0356 #05 Y:2007 | 05 | 2007 | Use photocell controls | $798 | $500 | |
| NC0356 #04 Y:2007 | 04 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,456 | $100 | |
| NC0356 #03 Y:2007 | 03 | 2007 | Replace electrically-operated equipment with fossil fuel equipment | $11,040 | $13,725 | |
| NC0356 #02 Y:2007 | 02 | 2007 | Modify process to reduce material use/cost | $20,393 | $10,000 | |
| NC0356 #01 Y:2007 | 01 | 2007 | Recover waste heat from equipment | $11,291 | $30,000 | |
| NC0357 #05 Y:2006 | 05 | 2006 | Change rate schedules or other changes in utility service | $277 | $100 | |
| NC0357 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,527 | $4,761 | |
| NC0357 #03 Y:2006 | 03 | 2006 | Develop a repair/replace policy | $699 | $375 | |
| NC0357 #02 Y:2006 | 02 | 2006 | Clean and maintain refrigerant condensers and towers | $16,558 | $5,600 | |
| NC0357 #01 Y:2006 | 01 | 2006 | Reduce the pressure of compressed air to the minimum required | $30,234 | $78,000 | |
| NC0354 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,936 | $2,559 | |
| NC0354 #07 Y:2006 | 07 | 2006 | Repair faulty insulation in furnaces, boilers, etc | $2,714 | $1,000 |