ITAC Assessment: NC0356
ITAC logo
ITAC Assessment: NC0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Optical cable
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 190,000
ft2
Annual Production 125,000,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,094,586 31,734,955
kWh
Electricity Demand $477,085 31,429
kW-mo/yr
Electricity Fees $394,882 -
Natural Gas $121,801 15,102
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,978 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,849

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $11,291 $30,000 $7,253
210,240
kWh
$4,038
-
kW-mo/yr
- - - - -
02 4.131: Modify process to reduce material use/cost $20,393 $10,000 - - - - - $5,793 $14,600
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,040 $13,725 $14,345
415,798
kWh
$7,991
-
kW-mo/yr
$(-11,296.0)
-
MMBtu
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,456 $100 $2,348
68,072
kWh
$1,308
-
kW-mo/yr
- $(-600.0) $(-600.0) - -
05 2.7134: Use photocell controls $798 $500 $378
10,950
kWh
$420
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $45,978 $54,325 $24,324
705,060
kWh
$13,757
-
kW-mo/yr
$(-11,296.0)
-
MMBtu
$(-600.0) $(-600.0) $5,793 $14,600
TOTAL IMPLEMENTED $22,849 $10,100 $2,348
68,072
kWh
$1,308
-
kW-mo/yr
- $(-600.0) $(-600.0) $5,793 $14,600
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs