Assessment Year | 2007 |
---|---|
Principal Product | Optical cable |
NAICS | 327212: Other Pressed and Blown Glass and Glassware Manufacturing |
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
190,000
ft2
|
Annual Production | 125,000,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,094,586 | 31,734,955 |
kWh
|
$0.034 |
Electricity Demand | $477,085 | 31,429 |
kW-mo/yr
|
$15.18 |
Electricity Fees | $394,882 | - |
|
- |
Natural Gas | $121,801 | 15,102 |
MMBtu
|
$8.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,978 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,849 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $11,291 | $30,000 |
$7,253
210,240
kWh
|
$4,038
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 4.131: Modify process to reduce material use/cost | $20,393 | $10,000 | - | - | - | - | - | $5,793 | $14,600 | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $11,040 | $13,725 |
$14,345
415,798
kWh
|
$7,991
-
kW-mo/yr
|
$(-11,296.0)
-
MMBtu
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,456 | $100 |
$2,348
68,072
kWh
|
$1,308
-
kW-mo/yr
|
- | $(-600.0) | $(-600.0) | - | - | |
05 | 2.7134: Use photocell controls | $798 | $500 |
$378
10,950
kWh
|
$420
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $45,978 | $54,325 |
$24,324
705,060
kWh
|
$13,757
-
kW-mo/yr
|
$(-11,296.0)
-
MMBtu
|
$(-600.0) | $(-600.0) | $5,793 | $14,600 | ||
TOTAL IMPLEMENTED | $22,849 | $10,100 |
$2,348
68,072
kWh
|
$1,308
-
kW-mo/yr
|
- | $(-600.0) | $(-600.0) | $5,793 | $14,600 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs