Assessment Year | 2007 |
---|---|
Principal Product | Fuel controls |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $100 M to 500M |
# of Employees | 335 |
Plant Area |
220,000
ft2
|
Annual Production | 7,500
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,189,598 | 20,904,663 |
kWh
|
$0.057 |
Electricity Demand | $79,470 | 48,074 |
kW-mo/yr
|
$1.65 |
Electricity Fees | $3,994 | - |
|
- |
Natural Gas | $403,562 | 22,709 |
MMBtu
|
$17.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $189,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,722 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $39,874 | $45,600 |
$39,874
700,774
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $32,774 | $100,000 |
$32,774
576,000
kWh
|
- | - | - | |
03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $65,972 | $100,000 |
$(-17,028.0)
(-251,896)
kWh
|
$83,000
-
MMBtu
|
- | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $35,076 | $2,000 |
$35,076
-
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,375 | $100 |
$4,775
83,925
kWh
|
- | $(-1,200.0) | $(-1,200.0) | |
06 | 2.1133: Adjust burners for efficient operation | $7,411 | $2,000 | - |
$7,411
-
MMBtu
|
- | - | |
07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $2,714 | $1,000 | - |
$2,714
-
MMBtu
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,936 | $2,559 |
$2,936
51,593
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $189,132 | $253,259 |
$98,407
1,160,396
kWh
|
$93,125
-
MMBtu
|
$(-1,200.0) | $(-1,200.0) | ||
TOTAL IMPLEMENTED | $12,722 | $4,659 |
$7,711
135,518
kWh
|
$7,411
-
MMBtu
|
$(-1,200.0) | $(-1,200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs