ITAC Assessment: NC0354
ITAC logo
ITAC Assessment: NC0354
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Fuel controls
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $100
M
to 500
M
# of Employees 335
Plant Area 220,000
ft2
Annual Production 7,500
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,189,598 20,904,663
kWh
Electricity Demand $79,470 48,074
kW-mo/yr
Electricity Fees $3,994 -
Natural Gas $403,562 22,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $189,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,722

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2612: Use cooling tower water instead of refrigeration $39,874 $45,600 $39,874
700,774
kWh
- - -
02 2.2437: Recover waste heat from equipment $32,774 $100,000 $32,774
576,000
kWh
- - -
03 2.1321: Replace fossil fuel equipment with electrical equipment $65,972 $100,000 $(-17,028.0)
(-251,896)
kWh
$83,000
-
MMBtu
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $35,076 $2,000 $35,076
-
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,375 $100 $4,775
83,925
kWh
- $(-1,200.0) $(-1,200.0)
06 2.1133: Adjust burners for efficient operation $7,411 $2,000 - $7,411
-
MMBtu
- -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,714 $1,000 - $2,714
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,936 $2,559 $2,936
51,593
kWh
- - -
TOTAL RECOMMENDED $189,132 $253,259 $98,407
1,160,396
kWh
$93,125
-
MMBtu
$(-1,200.0) $(-1,200.0)
TOTAL IMPLEMENTED $12,722 $4,659 $7,711
135,518
kWh
$7,411
-
MMBtu
$(-1,200.0) $(-1,200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs