ITAC Assessment: IC0326
ITAC logo
ITAC Assessment: IC0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product HDPE rigid plastic containers
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 200,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,624 7,465,113
kWh
Electricity Demand $206,749 18,979
kW-mo/yr
Electricity Fees $41,815 -
Natural Gas $40,381 4,981
MMBtu
Waste Disposal Costs
Water Usage $5,343 7,655
Tgal
TOTAL YEARLY COSTS $475,912
RECOMMENDED SAVINGS* $36,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $9,345 $13,327 $6,120
254,987
kWh
$3,225
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $440 - $241
10,032
kWh
$200
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $2,821 $4,859 $2,763
115,128
kWh
$58
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,819 $678 $2,039
84,959
kWh
$1,780
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $393 $1,089 $389
16,216
kWh
$4
-
kW-mo/yr
-
06 2.3191: Use demand controller or load shedder $657 $3,632 $170
7,080
kWh
- $487
-
MMBtu
07 2.2511: Insulate bare equipment $2,266 $2,982 $1,210
50,414
kWh
$1,056
-
kW-mo/yr
-
08 2.2628: Utilize a less expensive cooling method $15,398 $114,881 $8,221
342,550
kWh
$7,176
-
kW-mo/yr
-
09 2.3132: Recharge batteries on during off-peak demand periods $941 - - $941
-
kW-mo/yr
-
10 2.7221: Lower temperature during the winter season and vice-versa $93 - $50
2,067
kWh
$43
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,172 $141,447 $21,203
883,434
kWh
$14,483
-
kW-mo/yr
$487
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs