ITAC Assessment: NC0357
ITAC logo
ITAC Assessment: NC0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Texturized yarn
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2284: Thread Mills
Sales Range $5
M
to 10
M
# of Employees 74
Plant Area 80,000
ft2
Annual Production 4,400,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,550 8,982,580
kWh
Electricity Demand $142,338 14,449
kW-mo/yr
Electricity Fees $12,595 -
Natural Gas $277 1
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,295 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $277

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $30,234 $78,000 $20,807
717,472
kWh
$9,427
-
kW-mo/yr
- -
02 2.7211: Clean and maintain refrigerant condensers and towers $16,558 $5,600 - $1,558
-
kW-mo/yr
- $15,000
03 2.4151: Develop a repair/replace policy $699 $375 $479
16,511
kWh
$220
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,527 $4,761 $1,737
59,896
kWh
$790
-
kW-mo/yr
- -
05 2.8114: Change rate schedules or other changes in utility service $277 $100 - - $277
-
MMBtu
-
TOTAL RECOMMENDED $50,295 $88,836 $23,023
793,879
kWh
$11,995
-
kW-mo/yr
$277
-
MMBtu
$15,000
TOTAL IMPLEMENTED $277 $100 - - $277
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs