ITAC Assessment: AT0097
ITAC logo
ITAC Assessment: AT0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product DAIRY PRODUCTS
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area
n/a
Annual Production 18,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $546,969 10,245,604
kWh
Natural Gas $185,073 50,669
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,981 $2,213 $2,981
55,686
kWh
- -
02 2.4133: Use most efficient type of electric motors $2,740 $2,305 $2,740
51,290
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $6,223 - - $6,423
-
MMBtu
$(-200.0)
04 2.4312: Improve lubrication practices $509 - $509
9,672
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,707 - $2,707
50,703
kWh
- -
06 2.7226: Use computer programs to optimize hvac performance $4,298 $10,770 $4,298
80,598
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $845 $1,160 $845
15,826
kWh
- -
08 2.2511: Insulate bare equipment $1,315 $1,690 $1,315
24,619
kWh
- -
09 2.7261: Install timers and/or thermostats $1,847 $670 $1,847
34,584
kWh
- -
10 2.2121: Increase amount of condensate returned $2,675 $1,345 - $2,675
-
MMBtu
-
TOTAL RECOMMENDED $26,140 $20,153 $17,242
322,978
kWh
$9,098
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs