ITAC Assessment: IP0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Sheet Metal Fabricated Enclosures
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 193
Plant Area 107,300
ft2
Annual Production 200
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,266 1,708,200
kWh
Electricity Demand $103,772 6,787
kW-mo/yr
Electricity Fees $23,519 -
Natural Gas $52,407 7,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7261: Install timers and/or thermostats $3,077 $47 - - $3,077
-
MMBtu
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $437 $9 $437
8,096
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,655 $61 $1,655
30,633
kWh
- - - -
04 2.3192: Use fossil fuel powered generator during peak demand periods $12,878 $902 $12,878
238,450
kWh
- - - -
05 2.2511: Insulate bare equipment $6,052 $2,650 - - $6,052
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $1,932 $953 $1,251
23,166
kWh
$681
-
kW-mo/yr
- - -
07 2.3192: Use fossil fuel powered generator during peak demand periods $10,505 $7,153 $1,321
24,464
kWh
$26,834
-
kW-mo/yr
- - $(-17,650.0)
08 4.812: Apply for investment incentives $12,926 $10,000 - - - $12,926 -
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,874 $4,725 $(-63.0)
(-1,164)
kWh
- $1,937
-
MMBtu
- -
10 2.7135: Install occupancy sensors $50 $179 $50
914
kWh
- - - -
TOTAL RECOMMENDED $51,386 $26,679 $17,529
324,559
kWh
$27,515
-
kW-mo/yr
$11,066
-
MMBtu
$12,926 $(-17,650.0)
TOTAL IMPLEMENTED $41,478 $18,172 $16,291
301,643
kWh
$26,834
-
kW-mo/yr
$3,077
-
MMBtu
$12,926 $(-17,650.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs