5,176
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0318 #05 Y:2005 | 05 | 2005 | Eliminate or reduce compressed air usage | $1,927 | $5,332 | |
| NC0318 #04 Y:2005 | 04 | 2005 | Develop a repair/replace policy | $443 | $585 | |
| NC0318 #03 Y:2005 | 03 | 2005 | Replace hydraulic / pneumatic equipment with electric equipment | $10,275 | $18,500 | |
| NC0318 #02 Y:2005 | 02 | 2005 | Optimize plant power factor | $11,668 | $20,000 | |
| NC0318 #01 Y:2005 | 01 | 2005 | Use a less expensive method of waste removal | $39,375 | $1,000 | |
| NC0317 #07 Y:2005 | 07 | 2005 | Install occupancy sensors | $954 | $358 | |
| NC0317 #06 Y:2005 | 06 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,676 | $1,847 | |
| NC0317 #05 Y:2005 | 05 | 2005 | Utilize higher efficiency lamps and/or ballasts | $748 | $924 | |
| NC0317 #04 Y:2005 | 04 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $913 | $100 | |
| NC0317 #03 Y:2005 | 03 | 2005 | Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $116,959 | $53,625 | |
| NC0317 #02 Y:2005 | 02 | 2005 | Insulate feedwater tank | $2,381 | $1,000 | |
| NC0317 #01 Y:2005 | 01 | 2005 | Adjust burners for efficient operation | $10,821 | $1,000 | |
| NC0316 #04 Y:2005 | 04 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $327 | $100 | |
| NC0316 #03 Y:2005 | 03 | 2005 | Utilize higher efficiency lamps and/or ballasts | $491 | $321 | |
| NC0316 #02 Y:2005 | 02 | 2005 | Use cooling tower water instead of refrigeration | $10,570 | $26,949 | |
| NC0316 #01 Y:2005 | 01 | 2005 | Modify refrigeration system to operate at a lower pressure | $18,271 | $87,125 | |
| NC0315 #06 Y:2005 | 06 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $498 | $100 | |
| NC0315 #05 Y:2005 | 05 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $535 | - | |
| NC0315 #04 Y:2005 | 04 | 2005 | Reschedule plant operations or reduce load to avoid peaks | $2,731 | - | |
| NC0315 #03 Y:2005 | 03 | 2005 | Use / purchase optimum sized compressor | $4,799 | $10,000 |