Assessment Year | 2005 |
---|---|
Principal Product | Engineered hardwood flooring |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 230 |
Plant Area |
300,000
ft2
|
Annual Production | 33,000
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $213,082 | 9,565,920 |
kWh
|
$0.022 |
Electricity Demand | $140,235 | 17,297 |
kW-mo/yr
|
$8.11 |
Natural Gas | $159,964 | 15,037 |
MMBtu
|
$10.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $134,452 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $133,498 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $10,821 | $1,000 | - | - |
$10,821
-
MMBtu
|
- | - | |
02 | 2.2123: Insulate feedwater tank | $2,381 | $1,000 | - | - |
$2,381
-
MMBtu
|
- | - | |
03 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $116,959 | $53,625 |
$(-33,530.0)
(-838,260)
kWh
|
$(-9,475.0)
-
kW-mo/yr
|
$159,964
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $913 | $100 |
$1,413
35,337
kWh
|
$700
-
kW-mo/yr
|
- | $(-900.0) | $(-300.0) | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $748 | $924 |
$555
13,885
kWh
|
$193
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,676 | $1,847 |
$1,295
32,371
kWh
|
$381
-
kW-mo/yr
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $954 | $358 |
$954
23,856
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $134,452 | $58,854 |
$(-29,313.0)
(-732,811)
kWh
|
$(-8,201.0)
-
kW-mo/yr
|
$173,166
-
MMBtu
|
$(-900.0) | $(-300.0) | ||
TOTAL IMPLEMENTED | $133,498 | $58,496 |
$(-30,267.0)
(-756,667)
kWh
|
$(-8,201.0)
-
kW-mo/yr
|
$173,166
-
MMBtu
|
$(-900.0) | $(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs