ITAC Assessment: NC0317
ITAC logo
ITAC Assessment: NC0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Engineered hardwood flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 300,000
ft2
Annual Production 33,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,082 9,565,920
kWh
Electricity Demand $140,235 17,297
kW-mo/yr
Natural Gas $159,964 15,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $133,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.1133: Adjust burners for efficient operation $10,821 $1,000 - - $10,821
-
MMBtu
- -
02 2.2123: Insulate feedwater tank $2,381 $1,000 - - $2,381
-
MMBtu
- -
03 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $116,959 $53,625 $(-33,530.0)
(-838,260)
kWh
$(-9,475.0)
-
kW-mo/yr
$159,964
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $913 $100 $1,413
35,337
kWh
$700
-
kW-mo/yr
- $(-900.0) $(-300.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $748 $924 $555
13,885
kWh
$193
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,676 $1,847 $1,295
32,371
kWh
$381
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $954 $358 $954
23,856
kWh
- - - -
TOTAL RECOMMENDED $134,452 $58,854 $(-29,313.0)
(-732,811)
kWh
$(-8,201.0)
-
kW-mo/yr
$173,166
-
MMBtu
$(-900.0) $(-300.0)
TOTAL IMPLEMENTED $133,498 $58,496 $(-30,267.0)
(-756,667)
kWh
$(-8,201.0)
-
kW-mo/yr
$173,166
-
MMBtu
$(-900.0) $(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs