ITAC Assessment: UK1710
ITAC logo
ITAC Assessment: UK1710
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Commercial Printing
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2754: Commercial Printing, Gravure
Sales Range $5
M
to 10
M
# of Employees 135
Plant Area 40,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 3,640
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,353 1,878,100
kWh
Electricity Demand $25,149 4,420
kW-mo/yr
Electricity Fees $360 -
Natural Gas $23,454 3,571
MMBtu
Waste Disposal Costs
Water Usage $2,427 477
Tgal
Water Disposal $2,246 477
Tgal
TOTAL YEARLY COSTS $209,989
RECOMMENDED SAVINGS* $53,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7442: Keep doors and windows shut when not on use $7,278 - $6,653
80,154
kWh
$625
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $18,467 $25,474 $15,901
191,575
kWh
$2,566
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,276 $952 $1,276
15,375
kWh
- - -
04 2.7134: Use photocell controls $759 $60 $759
9,145
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,260 $750 - - - $2,260
-
MMBtu
06 2.3212: Optimize plant power factor $8,180 $18,216 - - $8,180 -
07 2.4152: Use only certified motor repair shops $1,143 $3,928 $933
11,240
kWh
$210
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,080 - $6,949
83,720
kWh
$131
-
kW-mo/yr
- -
09 2.4322: Use or replace with energy efficient substitutes $314 $311 $314
3,781
kWh
- - -
10 2.4224: Upgrade controls on compressors $2,600 $5,000 $2,156
25,975
kWh
$444
-
kW-mo/yr
- -
11 2.2437: Recover waste heat from equipment $4,338 $5,754 $2,250
27,115
kWh
$467
-
kW-mo/yr
- $1,621
-
MMBtu
TOTAL RECOMMENDED $53,695 $60,445 $37,191
448,080
kWh
$4,443
-
kW-mo/yr
$8,180 $3,881
-
MMBtu
TOTAL IMPLEMENTED $31,837 $35,725 $27,992
337,245
kWh
$3,845
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs