ITAC Assessment: AM0483
ITAC logo
ITAC Assessment: AM0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Radio receivers
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 137,600
ft2
Annual Production 1,600
pieces
Production Hrs. Annual 4,278
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $411,308 4,244,856
kWh
Electricity Demand $151,740 11,318
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,790

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $29,900 - - - - $29,900
02 2.4239: Eliminate or reduce compressed air usage $23,715 $820 $2,375
34,770
kWh
$890
-
kW-mo/yr
$20,450 -
03 2.3212: Optimize plant power factor $7,880 $27,800 - $7,880
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $4,870 $1,500 $4,130
60,500
kWh
$740
-
kW-mo/yr
- -
05 2.7124: Make a practice of turning off lights when not needed $3,920 - $2,570
37,600
kWh
$1,350
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,290 - $1,830
26,800
kWh
$460
-
kW-mo/yr
- -
07 2.7111: Reduce illumination to minimum necessary levels $3,610 $1,315 $2,760
40,400
kWh
$850
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,910 $2,130 $1,410
30,100
kWh
$500
-
kW-mo/yr
- -
09 2.7124: Make a practice of turning off lights when not needed $480 - $480
7,000
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $330 $160 $70
980
kWh
$5
-
kW-mo/yr
$255 -
TOTAL RECOMMENDED $78,905 $33,725 $15,625
238,150
kWh
$12,675
-
kW-mo/yr
$20,705 $29,900
TOTAL IMPLEMENTED $41,790 $1,660 $9,080
132,880
kWh
$2,555
-
kW-mo/yr
$255 $29,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs