ITAC Assessment: NC0315
ITAC logo
ITAC Assessment: NC0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product heat treated and coated metal parts
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 80,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,323 1,007,030
kWh
Electricity Demand $27,249 3,550
kW-mo/yr
Electricity Fees $2,433 -
Natural Gas $91,166 8,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,261 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $25,232 $100,000 - - $25,232
-
MMBtu
- - - -
02 3.1293: Separate treatments for each type of solution and recycle $12,466 $45,000 - - - $594
-
gal
- - $11,872
03 2.4226: Use / purchase optimum sized compressor $4,799 $10,000 $3,165
84,812
kWh
$1,634
-
kW-mo/yr
- - - - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,731 - $226
-
kWh
$2,505
-
kW-mo/yr
- - - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $535 - $82
-
kWh
$453
-
kW-mo/yr
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $498 $100 $724
19,396
kWh
$374
-
kW-mo/yr
- - $(-300.0) $(-300.0) -
TOTAL RECOMMENDED $46,261 $155,100 $4,197
104,208
kWh
$4,966
-
kW-mo/yr
$25,232
-
MMBtu
$594
-
gal
$(-300.0) $(-300.0) $11,872
TOTAL IMPLEMENTED $46,261 $155,100 $4,197
104,208
kWh
$4,966
-
kW-mo/yr
$25,232
-
MMBtu
$594
-
gal
$(-300.0) $(-300.0) $11,872
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs