ITAC Assessment: NC0316
ITAC logo
ITAC Assessment: NC0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Stretch wrap
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 59,000
ft2
Annual Production 2,689,600
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $507,468 24,634,368
kWh
Electricity Demand $376,795 45,672
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,659 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $18,271 $87,125 $24,360
609,000
kWh
$7,128
-
kW-mo/yr
$(-13,217.0)
-
Tgal
- -
02 2.2612: Use cooling tower water instead of refrigeration $10,570 $26,949 $10,570
264,260
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $491 $321 $380
9,504
kWh
$111
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $327 $100 $793
19,824
kWh
$234
-
kW-mo/yr
- $(-400.0) $(-300.0)
TOTAL RECOMMENDED $29,659 $114,495 $36,103
902,588
kWh
$7,473
-
kW-mo/yr
$(-13,217.0)
-
Tgal
$(-400.0) $(-300.0)
TOTAL IMPLEMENTED $327 $100 $793
19,824
kWh
$234
-
kW-mo/yr
- $(-400.0) $(-300.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs