| Assessment Year | 1982 |
|---|---|
| Principal Product | HEAT EXCHANGERS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 300
pieces
|
| Production Hrs. Annual | 3,680
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $154,176 | 4,410,024 |
kWh
|
$0.035 |
| Natural Gas | $107,778 | 42,946 |
MMBtu
|
$2.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $55,699 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,616 | $135 |
$7,616
254,396
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $501 | $121 |
$501
16,706
kWh
|
- | |
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $44,316 | $156,240 | - |
$44,316
-
MMBtu
|
|
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $275 | $80 |
$275
8,206
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $656 | $560 |
$656
17,585
kWh
|
- | |
| 06 | 2.3212: Optimize plant power factor | $2,335 | $6,560 |
$2,335
-
kWh
|
- | |
| TOTAL RECOMMENDED | $55,699 | $163,696 |
$11,383
296,893
kWh
|
$44,316
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs