Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product HEAT EXCHANGERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 3,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,176 4,410,024
kWh
Natural Gas $107,778 42,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,616 $135 $7,616
254,396
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $501 $121 $501
16,706
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $44,316 $156,240 - $44,316
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $275 $80 $275
8,206
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $656 $560 $656
17,585
kWh
-
06 2.3212: Optimize plant power factor $2,335 $6,560 $2,335
-
kWh
-
TOTAL RECOMMENDED $55,699 $163,696 $11,383
296,893
kWh
$44,316
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs