ITAC Assessment: LL0112
ITAC logo
ITAC Assessment: LL0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Styrene
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $100
M
to 500
M
# of Employees 17
Plant Area 483,000
ft2
Annual Production 400,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,126,859 19,202,000
kWh
Natural Gas $12,744,950 2,390,267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,556,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $370,482

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $477,641 $1,116,799 $976,435
16,000,000
kWh
$(-498,794.0)
-
MMBtu
02 2.1331: Burn a less expensive grade of fuel $1,598,858 $154,800 - $1,598,858
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,154 $1,200 $11,154
190,078
kWh
-
04 2.2511: Insulate bare equipment $5,437 $9,810 - $5,437
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $353,891 $50,860 - $353,891
-
MMBtu
06 2.7134: Use photocell controls $109,215 $1,962 $109,215
1,861,200
kWh
-
TOTAL RECOMMENDED $2,556,196 $1,335,431 $1,096,804
18,051,278
kWh
$1,459,392
-
MMBtu
TOTAL IMPLEMENTED $370,482 $61,870 $11,154
190,078
kWh
$359,328
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs