ITAC Assessment: UF0622
ITAC logo
ITAC Assessment: UF0622
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product PVC Conduit and Fittings
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 27,600
ft2
Annual Production 50,392,100
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $554,742 9,828,939
kWh
Electricity Demand $69,194 16,274
kW-mo/yr
Electricity Fees $28,753 -
LPG $13,023 979
MMBtu
TOTAL YEARLY COSTS $665,712
RECOMMENDED SAVINGS* $231,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $41,219 $322,608 $37,137
663,164
kWh
$4,082
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $43,371 $52,879 $38,529
688,026
kWh
$4,842
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $13,853 $3,888 $13,853
247,376
kWh
- -
04 2.4133: Use most efficient type of electric motors $10,345 $12,420 $9,155
163,477
kWh
$1,190
-
kW-mo/yr
-
05 2.4321: Upgrade obsolete equipment $10,345 $46,500 $8,750
156,250
kWh
$1,595
-
kW-mo/yr
-
06 2.6231: Utilize controls to operate equipment only when needed $5,789 $25,360 $5,789
103,373
kWh
- -
07 2.2623: Minimize condenser cooling water temperature $5,875 $6,148 $5,875
104,906
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,035 - $5,035
88,222
kWh
- -
09 4.661: Level zero – install control systems for existing equipment $16,512 $11,225 $16,512
294,868
kWh
- -
10 4.662: Level one – add communication using iiot devices to existing control system to modify operations $46,005 - $46,005
821,512
kWh
- -
11 4.424: Improve space comfort conditioning $30,240 $788 - - $30,240
12 4.463: Modify facility to avoid excess maintenance costs $3,200 $3,200 - - $3,200
TOTAL RECOMMENDED $231,789 $485,016 $186,640
3,331,174
kWh
$11,709
-
kW-mo/yr
$33,440
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs