Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,025

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0086 #10 Y:2026 Install replacement doors $222 $479
MU0086 #09 Y:2026 Insulate glazing, walls, ceilings, and roofs $299 $105
MU0086 #08 Y:2026 Improve air circulation with destratification fans / other methods $2,199 $7,543
MU0086 #07 Y:2026 Reduce illumination to minimum necessary levels $1,434 -
MU0086 #06 Y:2026 Use or replace with energy efficient substitutes $465 $1,800
MU0086 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,874 $500
MU0086 #04 Y:2026 Recover heat from exhausted steam, hot air or hot water $10,899 $19,446
MU0086 #03 Y:2026 Replace fossil fuel equipment with electrical equipment $256 $2,836
MU0086 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $17,017 $10,890
MU0086 #01 Y:2026 Increase use of automation $21,996 $3,808
MU0085 #09 Y:2026 Utilize higher efficiency lamps and/or ballasts $12 $35
MU0085 #08 Y:2026 Close holes and openings in building such as broken windows $41 $32
MU0085 #07 Y:2026 Close holes and openings in building such as broken windows $6,179 $6
MU0085 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $584 $1,353
MU0085 #05 Y:2026 Use photocell controls $356 $403
MU0085 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,961 -
MU0085 #03 Y:2026 Install compressor air intakes in coolest locations $1,488 $455
MU0085 #02 Y:2026 Insulate glazing, walls, ceilings, and roofs $10,748 $73,099
MU0085 #01 Y:2026 Use solar heat to make electricty $74,639 $1,091,000
MU0084 #07 Y:2026 Pay bills on time to avoid late fees $16,942 -