Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,182

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0096 #11 Y:2026 Use or replace with energy efficient substitutes $957 $1,150
MU0096 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $746 $2,814
MU0096 #09 Y:2026 Use photocell controls $483 $125
MU0096 #08 Y:2026 Install compressor air intakes in coolest locations $4,476 $2,631
MU0096 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $8,180 $5,490
MU0096 #06 Y:2026 Keep equipment clean $330 -
MU0096 #05 Y:2026 Insulate bare equipment $1,411 $875
MU0096 #04 Y:2026 Install occupancy sensors $301 $139
MU0096 #03 Y:2026 Recover waste heat from equipment $9,314 $2,724
MU0096 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,592 -
MU0096 #01 Y:2026 Apply for tax-free status for energy purchases $16,000 -
MU0095 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,302 $1,530
MU0095 #07 Y:2026 Install occupancy sensors $322 $1,128
MU0095 #06 Y:2026 Use photocell controls $88 $124
MU0095 #05 Y:2026 Reduce illumination to minimum necessary levels $258 -
MU0095 #04 Y:2026 Turn off equipment when not in use $32 -
MU0095 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $12,746 -
MU0095 #02 Y:2026 Use solar heat to make electricty $66,138 $1,100,000
MU0095 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $64,082 $76,821
MUCM40 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $870 $4,029