ITAC Assessment: MU0071
ITAC logo
ITAC Assessment: MU0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wood
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 165,000
ft2
Annual Production 17,000,000
units
Production Hrs. Annual 4,264
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,098 4,927,832
kWh
Electricity Demand $217,201 27,807
kW-mo/yr
Electricity Fees $13,737 -
Natural Gas $107,806 19,426
MMBtu
Fuel Oil #1 $19,255 931
MMBtu
Other Gas $2,889 1
MMBtu
TOTAL YEARLY COSTS $755,986
RECOMMENDED SAVINGS* $30,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Ancillary Material Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $25,925 $65,000 $(-1,076.1)
(-13,451)
kWh
$(-504.4)
-
kW-mo/yr
$19,255
-
MMBtu
$8,250
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,851 $577 $2,514
31,431
kWh
$336
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,188 $3,637 $859
10,732
kWh
$330
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $442 $1,277 $323
4,032
kWh
$119
-
kW-mo/yr
- -
TOTAL RECOMMENDED $30,406 $70,491 $2,619
32,744
kWh
$281
-
kW-mo/yr
$19,255
-
MMBtu
$8,250
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs