Assessment Year | 1990 |
---|---|
Principal Product | POLYETHYLENE CONTAINERS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
n/a
|
Annual Production | 83,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $449,362 | 9,312,720 |
kWh
|
$0.048 |
Natural Gas | $15,439 | 3,663 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,674 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,211 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,900 | $480 |
$15,900
331,184
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,800 | $5,200 |
$13,800
287,222
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,950 | $1,800 | - |
$1,950
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $5,420 | $2,780 |
$5,420
113,130
kWh
|
- | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $465 | $3,000 |
$(-805.0)
(-16,706)
kWh
|
$1,270
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $1,421 | $263 |
$1,421
29,601
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $577 | $350 |
$577
12,016
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $360 | $512 |
$360
7,620
kWh
|
- | |
09 | 2.3212: Optimize plant power factor | $6,781 | $25,000 |
$6,781
-
kWh
|
- | |
TOTAL RECOMMENDED | $46,674 | $39,385 |
$43,454
764,067
kWh
|
$3,220
-
MMBtu
|
||
TOTAL IMPLEMENTED | $44,211 | $35,772 |
$42,261
739,156
kWh
|
$1,950
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs