2,746
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0459 #04 Y:2025 | 04 | 2025 | Replace fossil fuel equipment with electrical equipment | $13,399 | $125,000 |
n/a
|
| MS0459 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $6,256 | $15,684 |
n/a
|
| MS0459 #02 Y:2025 | 02 | 2025 | Air condition only space necessary | $7,093 | $16,009 |
n/a
|
| MS0459 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,270 | $5,219 |
n/a
|
| MS0458 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,619 | $6,958 |
n/a
|
| MS0458 #04 Y:2025 | 04 | 2025 | Install an uninteruptable power supply | $641,025 | $2,463,127 |
n/a
|
| MS0458 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $179,318 | $1,231,714 |
n/a
|
| MS0458 #02 Y:2025 | 02 | 2025 | Install replacement doors | $37,927 | $16,051 |
n/a
|
| MS0458 #01 Y:2025 | 01 | 2025 | Level zero – install control systems for existing equipment | $7,105 | $13,400 |
n/a
|
| MS0456 #04 Y:2025 | 04 | 2025 | Level zero – install control systems for existing equipment | $2,657 | $901 |
n/a
|
| MS0456 #03 Y:2025 | 03 | 2025 | Install vinyl strip / high speed / air curtain doors | $1,170 | $14,739 |
n/a
|
| MS0456 #02 Y:2025 | 02 | 2025 | Do not use compressed air for personal cooling | $603 | - |
n/a
|
| MS0456 #01 Y:2025 | 01 | 2025 | Replace fossil fuel equipment with electrical equipment | $31,025 | $150,000 |
n/a
|
| MS0455 #04 Y:2025 | 04 | 2025 | Reduce delivery schedules | $170,400 | $21,600 |
n/a
|
| MS0455 #03 Y:2025 | 03 | 2025 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $675 | $2,667 |
n/a
|
| MS0455 #02 Y:2025 | 02 | 2025 | Use solar heat to make electricty | $17,043 | $161,000 |
n/a
|
| MS0455 #01 Y:2025 | 01 | 2025 | Replace fossil fuel equipment with electrical equipment | $15,878 | $75,000 |
n/a
|
| MS0454 #04 Y:2025 | 04 | 2025 | Re-size charging openings or add movable cover or door | $12,383 | - |
n/a
|
| MS0454 #03 Y:2025 | 03 | 2025 | Replace treated water with well / surface water | $18,747 | $35,952 |
n/a
|
| MS0454 #02 Y:2025 | 02 | 2025 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $11,257 | $1,712 |
n/a
|