Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,746

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0459 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $13,399 $125,000
MS0459 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,256 $15,684
MS0459 #02 Y:2025 Air condition only space necessary $7,093 $16,009
MS0459 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,270 $5,219
MS0458 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,619 $6,958
MS0458 #04 Y:2025 Install an uninteruptable power supply $641,025 $2,463,127
MS0458 #03 Y:2025 Use solar heat to make electricty $179,318 $1,231,714
MS0458 #02 Y:2025 Install replacement doors $37,927 $16,051
MS0458 #01 Y:2025 Level zero – install control systems for existing equipment $7,105 $13,400
MS0456 #04 Y:2025 Level zero – install control systems for existing equipment $2,657 $901
MS0456 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $1,170 $14,739
MS0456 #02 Y:2025 Do not use compressed air for personal cooling $603 -
MS0456 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $31,025 $150,000
MS0455 #04 Y:2025 Reduce delivery schedules $170,400 $21,600
MS0455 #03 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $675 $2,667
MS0455 #02 Y:2025 Use solar heat to make electricty $17,043 $161,000
MS0455 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $15,878 $75,000
MS0454 #04 Y:2025 Re-size charging openings or add movable cover or door $12,383 -
MS0454 #03 Y:2025 Replace treated water with well / surface water $18,747 $35,952
MS0454 #02 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $11,257 $1,712