Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,827

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0472 #06 Y:2026 Turn off equipment when not in use $9,021 -
MS0472 #05 Y:2026 Install occupancy sensors $277 $1,946
MS0472 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $4,205 -
MS0472 #03 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $174 -
MS0472 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,104 $4,093
MS0472 #01 Y:2026 Moderate cooling tower outlet temperature $1,553 $248
MS0471 #05 Y:2026 Apply for tax-free status for energy purchases $31,195 -
MS0471 #04 Y:2026 Air condition only space necessary $1,695 $5,231
MS0471 #03 Y:2026 Use solar heat to make electricty $368,607 $4,228,200
MS0471 #02 Y:2026 Eliminate or reduce compressed air usage $182 -
MS0471 #01 Y:2026 Install occupancy sensors $22,607 $12,329
MS0470 #07 Y:2026 Chill water to the highest temperature possible $126 -
MS0470 #06 Y:2026 Reduce space conditioning during non-working hours $6,122 -
MS0470 #05 Y:2026 Separate and recycle scrap metal to foundry or for sale $10 -
MS0470 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $980 $1,323
MS0470 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $50 -
MS0470 #02 Y:2026 Install occupancy sensors $491 $2,310
MS0470 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $159 $540
MS0469 #07 Y:2026 Turn off equipment when not in use $13,592 -
MS0469 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $61,305 $25,039